INFRASTRUCTURE

Project: General Purpose Sports Room of Rades

Client: : Ministry of Equipment
Project duration: 11months
Intervention period: 5 months
Capacity: 10000 seats
Executed works : Erection of prefabricated tribunes Erection of steel structure and the whole roof of the room

Project: LAICO Hotel BRAZAVILLE CONGO

Client: LAICO
Project duration: 3 years
Executed works : Construction works of a 5 stars hotel, Rooms: 168, Junior suits: 8, Presidential suit: 1, Diplomatic suites: 2

Project: Olympic Stadium of Rades

Client: Ministry of Equipment
Capacity: 60.000 seats
Project duration: 36 months
Intervention period: 10 months
Executed works : Erection of prefabricated elements, Erection of the steel structure, Pylons erection.

Project: international Airport of Ennfidha

Client: TAV
Project duration: 12 months
Executed works : Fabrication and erection of the entire gallery and the plane access tunnel. 2000 tons



MAIN ACTIVITIES

1- ERECTION OF ALL TYPES OF CONCRETE PRECAST CONCRETE ELEMENTS.

2- ERECTION OF STEEL STRUCTURES AND SUPPORTS INCLUDING THE STRUCTURING STRUCTURES.

3- UNDERGROUND SETTING OF UNDERPRESSURE AND GRAVITATED PIPES OF ALL DIAMETERS AND DEPTHS.

4- LEVELING WORKS AND CONCRETE FOUNDATIONS.

5- LANDSCAPING WORKS AND EQUIPMENTS OF LIVINGQUARTERS .



Gallery images

CEMENT PLANT

Project: Cement plant of SOTACIB Kairouan

Client: SOTACIB / KAIROUAN
Project duration: 14 months
Travaux réalisés : Earth movement: 350.000M3, Concrete: 50.000m3, Armature: 7800 Tons, Mechanical equipment: 8500 Tons, Metal structure: 7500 Tons, Piping Manufacturing : 500 Tons, Refractory erections works: 2700 Tons, Electrical installation, Instrumentation, Painting

Project: New production line of Feriana white cement plant

Client: SOTACIB
Project duration: 14 months
Executed works : Earth movement: 80.000M3, Concrete: 25.000m3, Armature: 3800 tons, Erected mechanical equipment: 7000 tons, Erected steel structures and supports: 6500 tons, Fabrication and erection of pipes: 400 tons, Setting of refractor: 1700 tons, Electrical installation, Instrumentation – Painting& insulation work

Project: Cement plant of Gabes

Client: SCG
Project duration: 6 months
Executed works: Mechanical erection: 3000 tons, Steel structures: 2800 tons, Fabrication and erection of pipes: 150 tons, Setting of refractor: 600 tons, Electrical installation, Instrumentation, Painting, Insulation work

Project: Tunisian artificial cements (CAT)

Client : COLACEM
Executed works: Mechanical equipment Erected and dismounted: 9000 tons, Steel structures Erected and dismounted: 600 tons, Fabrication and erection of pipes, Electrical installation, Instrumentation, Painting, Insulation Work.

MAIN ACTIVITIES

1- MANUFACTURING AND ERECTION OF THE STRUCTURE.

2- ERECTION OF THE MECHANICAL EQUIPMENTS

3- PREFABRICATION AND ERECTION OF ALL TYPES OF PIPES

4- ELECTRICAL INSTALLATION

5- INSTRUMENTATION ISOLATION WORKS

6- REFRACTORY SETTING

Gallery images

OIL AND GAS

Project: CPF-WAHA Production facilities

Client: PIONEER/ETAP
Project duration: 8 months
Executed works: Erection of mechanical equipments: 600T, Erection of steel structure and supports: 300T, Pipes prefabrication and erection: 550T, Electrical installation Instrumentation, Surface treatment Thermal isolation.

Project: Revamping and construction works

Client: PERENCO/ETAP
Project duration: 5 months
Executed works: Erection of mechanical equipments: 700T, Erection of steel structure and supports: 300T, Pipes prefabrication and erection: 350T, Electrical installation Instrumentation, Surface treatment Thermal isolation.

Project: Gas compression station Haouaria

Client: SNAMPROGETTI
Project duration: 8 months
Executed works: Erection of mechanical equipments: 500T, Erection of steel structure: 250T, Pipes prefabrication and erection: 800T, Electrical installation Instrumentation, Surface treatment Thermal isolation.

Project: LPG Gabes GHANNOUCH

Client: STEG
Project duration: 12 months
Executed works: Erection of mechanical equipments: 828T, Erection of steel structure and supports: 350T, Pipes prefabrication and erection: 583T, Electrical installation Instrumentation, Surface treatment Thermal isolation.

MAIN ACTIVITES

1- STRUCTURES FABRICATION AND ERECTION

2- MECHANICAL EQUIPMENTS ERECTION

3- PREFABRICATION AND ERECTION OF ALL KINDS OF PIPES (CS, AS, AND SS)

4- ELECTRICAL INSTALLATION

5- INSTRUMENTATION

6- PIPELINES SETTING

Gallery images

TELECOMMNUNICATION

EXTERNAL INFRASTRUCTURE OF TELECOMMUNICATION SITES

FOR THIS CHAPTER CERI MAY OFFER THE FOLLOWING SERVICES:

Searching for sites:
Due to our knowledge of the fields in Tunisia and our knowhow in the realisation of GSM sites and based on our local competences, CERI may contribute to the searching and negociation of GSM sites
Realisation on turnkey basis of rooftop sites
Supply and installation of shelters (according to client recommendations)
Supply and installation of generators groups
Supply and installation of rooftop masts including antenna supports
Supply and installation of electrical boxes
Supply and installation of lighting conductor earthling systems.
Steel stands for outdoor BTS and shelter
Night marking system
REALIZATION on turnkey basis of green field sites
Supply and installation of shelters (according to client recommendations)
Construction in hard of shelters
Supply and installation of generators groups

MAIN ACTIVITES

1- FABRICATION, ERECTION OF ALL TYPES OF PYLONS

2- ERECTION OF EQUIPMENTS ON ANTENNAS (BTS, BATTERIES …)

Gallery images

ENERGY

Project: Construction of combined cycle electrical power plant at Sousse

Client: GEC ALSTOM
Executed works: Erection of mechanical equipments: 3500T, Erection of steel structure and supports: 2800T, Pipes prefabrication and erection: 500T,

Project: KCHABTA and METLINE (Towers erection)

Client: STEG/GAMESA
Project duration: 18 months
Executed works: Erection of 91 wind turbine towers of 1.32MW, Erection of mechanical equipments: 7280T, Erection of steel structure and supports: 9646T, Leveling works, excavation and civil works of 91 towers.

Project: SIDI DAOUED wind turbine station

Client: STEG/MADE
Project duration: 8 months
Executed works: Executed works: Erection of 26 wind turbine towers of 1.32MW, Erection of mechanical equipments: 2000T, Erection of steel structure and supports: 4000T.

Project: CONSTRUCTION OF ELECTRICAL POWER PLANT AT GANOUCHE GABES ALSTOM

Client: STEG
Project duration: 12 months
Executed works: Erection of mechanical equipments: 4500T, Erection of steel structure and supports: 400T, Pipes prefabrication and erection: 600T, Electrical installation, Instrumentation, Surface treatment, Thermal isolation.

MAIN ACTIVITES

1- FABRICATION AND ERECTION OF STEEL STRUCTURES AND SUPPORTS

2- ERECTION OF MECHANICAL EQUIPMENTS

3- PREFABRICATION AND ERECTION OF ALL KINDS OF PIPES (CS, AS, AND SS)

4- ELECTRICAL INSTALLATION

5- INSTRUMENTATION